Installation Requirements
2015 IRC IWS Required at Eave Edges in Cold Climates
2015 IRC No-Reuse of Flashings
2012 IRC Non-Reuse of Flashings
2012 IRC Rain Diverter and Flashing at Pitch Change Areas
2015 IRC Net Ventilation
2012 IRC Ventilation on Vaulted Ceilings Requires Baffle Vents
2012 IRC Minimum Venting Requirements
2012 IRC Minimum Venting Requirements (cont'd)
2012 IRC Following Manufacturer Installation Instructions. Covers Hip, Ridge and Starter
2015 IRC Requirement for Crickets on Chimneys Wider than 30 Inches
2012 IRC Cricket Required on Chimneys Wider than 30 inches
2015 IRC Valley Lining and Flashing Requirements
2012 IRC Valleys
2012 IBC Valley Requirements
2009 IBC Valley Requirements
2015 IRC Sheathing Nailing Pattern
2012 IRC Sheathing Nailing Pattern
2015 IRC Redecking Table
2012 IBC Solid Sheathed Deck Requirement
2009 IBC Solid Sheathing Requirement
2012 IBC Recovering Versus Replacement
2015 Material Must be Installed in Accordance with Manufacturer Standards (hip_ridge and starter)
2009 IBC Reinstallation of Materials Requirements
2012 IRC Flashing Must Meet Manufacturer Specs and Must Prime with Mod Bit
2012 IBC Flashing Reinstallation Requirements
2015 IRC Drip Edge
2012 IRC Drip Edge
2012 IBC Drip Edge Requirements
2009 IBC Drip Edge Requirement
2012 IBC Manufacturers Instructions Requirement
2009 IBC Manufacturers Instructions Requirement
Mailing Address: 2770 Main St., Ste. 168, Frisco, TX 75034
Dallas Location: 2730 N Stemmons Fwy #415, Dallas, TX 75207 |
Copyright 2018 © Roofing Giant ® All rights reserved. Roofing Giant ® is a registered trademark and is the property of Construction Giant, Inc. Do not use our trademark without a written permission from Construction Giant, Inc.
By Roofing Giant | Dallas Roofing Company | Dallas Roofing Contractor | Dallas Roofer | Privacy Policy | Terms of Use |
By Roofing Giant | Dallas Roofing Company | Dallas Roofing Contractor | Dallas Roofer | Privacy Policy | Terms of Use |